Skip to main content
Loading…
This section is included in your selections.

(a) Zoning district uses. The land uses allowed in a commercial PUD shall be those permitted uses for the district listed on the use table in section 24-45. Uses for the district shown as special exceptions require specific approval by the Plan Commission during the PUD process.

(b) Bulk requirements.

(1) Area minimum: Twenty (20) acres.

(2) Width minimum: Eight hundred (800) feet.

(3) Setbacks. Setback requirements for all yards shall be that of the zoning district in which the property is located unless, upon good cause shown with the public interest secured, a waiver to the same is granted by the Plan Commission and included within the ordinance creating the PUD zoning district.

(4) Buffer yards required on the periphery. The yards of the periphery of the PUD will comply with the buffer yards required in article XII.

(Ord. No. 1483, § 1, 1-15-09)