(a) Zoning district uses. The land uses allowed in an industrial PUD shall be those permitted uses for the district shown on the use table in article II. Uses for the district shown as special exceptions require approval by the Plan Commission as part of the PUD process.

(b) Bulk requirements.

(1) Area minimum: Twenty (20) acres.

(2) Width minimum: Eight hundred (800) feet.

(3) Setbacks. Setback requirements for all yards shall be that of the zoning district in which the property is located unless, upon good cause shown with the public interest secured, a waiver to the same is granted by the Plan Commission and included within the ordinance creating the PUD zoning district.

(4) Buffer yards required on the periphery. The yards of the periphery of the PUD will comply with the buffer yards required in article XII.

(Ord. No. 1483, § 1, 1-15-09)