Skip to main content
Loading…
This section is included in your selections.

Fee Schedule

(a) Residential:

Zoning permit ..…....…....…....…....….….

$50.00

Administrative fee ..…....…....…....….….

$20.00

Per each $1,000.00 of estimated cost of construction, plus administrative fee

$7.00

Per plumbing fixture plus $20.00 administration fee (with $25.00 minimum fee)

$5.00

Electrical, per amp plus administrative fee

$1.00

Early service ..…....…....

$80.00

Temporary pole ..…...….

$80.00

(b) Escrow:

Residential ..…....…....…....….…….......

$1,000.00

Commercial/Industrial ..….….....…...…..

$2,000.00

(c) Sewer tap-in total (if tap made with development) ($50.00 for permit and $1,379.00 expansion)

$1,429.00

(d) Water—One-inch service

$1,500.00

(e) Commercial/industrial:

Per each $1,000.00 of estimated cost of construction

$7.50

Electrical service, per ampere

$2.00

Per required inspection (to be determined by electrical inspector, plus $20.00 administration fee)

$80.00

(f) Reinspections (building/plumbing/electrical)

$40.00

(g) The following fees for permits include a twenty dollar ($20.00) administrative fee and a fifty dollar ($50.00) zoning permit fee:

Decks (no zoning permit required)

$175.00

Fences (no zoning permit required)

$75.00

Garages (does not include any electrical)

$85.00

Pools (does not include any electrical)

$195.00

Sheds (no zoning permit required)

$75.00

Signs (per side plus administration/zoning fees; does not include any electrical), per square foot

$2.00

(h) Electrical: All electrical permits for the above (on existing service)

$45.00

(Ord. No. 0985, § 10, 3-23-95; Ord. No. 1202, 3-22-01; Ord. No. 1243, §§ 1, 2, 2-28-02; Ord. No. 1255, §§ 1, 2, 5-23-02; Ord. No. 1437, §§ 1, 2, 12-21-06; Ord. No. 1441, § 1, 3-15-07; Ord. No. 1643, § 1, 4-27-17; Ord. No. 1719, § 10, 10-28-20)